Logo Bayernportal
- no location -

List of authorized verifiers for stability; application for registration with the Bavarian Chamber of Civil Engineers

If you have completed a degree in civil engineering, you can apply for entry in the list of authorized verifiers for structural stability at the Bavarian Chamber of Civil Engineers.

Forms

Responsible for you

For contact details of the responsible authoritiy and local valid information select under "Select location" a location.
Stilisiertes Bild eines Hauses
Bayerische Ingenieurekammer-Bau
Mehr zur Behörde

Procedure details

In order for an engineer to be authorized to provide proof of stability, he or she must be entered in the list of persons authorized to provide proof of stability.

The registration committee of the Bavarian Chamber of Civil Engineers checks the requirements and decides on the entry in the corresponding list.

  • professionally qualifying university degree in the field of civil engineering
  • At least three years of professional experience in structural design

  • The following documents are required:
    • Official certificate of good conduct (copy not older than 3 months)
    • Proof of entitlement to use the professional title (civil engineer) stipulated in the Engineering Act (BayRS 702-2-W) by means of copies/photocopies of certificates and/or official confirmations
    • Proof of practical experience of at least three years as a civil engineer in structural design, if possible in the last few years prior to application (project list, references).

You must submit the application and all necessary documents to the Registration Committee of the Bavarian Chamber of Engineers-Civil Engineering.

  • for members of the Bavarian Chamber of Civil Engineers: EUR 230.00
  • for non-members: EUR 414.00
  • In addition, there is an annual list management fee of between EUR 0 and EUR 67.00, depending on membership and type of membership.

For the applicant: none For the authority: three months after receipt of the application and complete submission of the documents. The deadline can be extended once by up to one month.

As a rule, processing takes between 4 and 8 weeks.

Administrative court action

Status: 16.04.2025
Editorial responsibility Bayerisches Staatsministerium für Wohnen, Bau und Verkehr
Contains machine translated content. Show the original content